Report No.

248

Discipline/Origin

Drilling
No origin

Well

Grosbeak
35/11-21 A

Date created

2020/06/16
1999 days ago

Project Phase

Operational
Project Phase

LL Type/Classification

Operational
Negative

Transocean Arctic


What happened in Reservoir section:
Max flowrate for extracting formation fluid with the FTWT tool was said to be 6-7 lpm. During this job, the average flowrate up to sampling depth station #4 was only 1-2 lpm. The reason for the low flowrate was to no create too much drawdown pressure in order to prevent the fluid from reaching it’s bubble point (gas boiling out of fluid).

What Was Planned

Run FTWT.

What Was Learned

Took very long time to circulate out 300 litres of formation fluid before one could take a clean sample.

What Actions Are Required

Consider the long circulation time required for next job using FTWT.